Campus Valla, university building
Linkoping, Sweden
In this project, UPB provided engineering, production, delivery and assembly of steel and reinforced concrete structures, as well as the assembly of CLT panels and adhesives. Building has 7 storeys and total area is about 13,000 sq.m. Accordingly - 630 t of steel constructions, 11 500 m2 of reinforced concrete panels, 2 800 m2 of wall elements, 12 000 m2 of floor panels and 45 m3 of grandstand elements were used in the spacious building.
STEEL STRUCTURES | PREFABRICATED CONCRETE | GLASS | ALUMINIUM
Engineering, production, delivery, assembly.